
Bingham Farms in Oakland County, Michigan maintains a peaceful atmosphere for its residents. FLAME Heating, Cooling, Plumbing and Electrical is dedicated to keeping Bingham Farms families comfortable all year long.
That’s why FLAME installs only the most reliable and highest efficiency HVAC products. Call us today, so we can help you find the best heating and cooling solution for your home, as well as your budget.
Bingham Farms residents trust the airflow pros for all their heating and cooling needs.
Call FLAME today, at (586) 217-2512, or sign up online, and we’ll call you!
Recent Jobs and Reviews in Bingham Farms , MI
Bingham Farms, MI at a glance
Flame Heating, Cooling, Plumbing, Electrical has completed 19 jobs in Bingham Farms, MI between May 2026 and September 2026.
The most recent job was on September 9, 2026.
Flame Heating, Cooling, Plumbing, Electrical has completed 19 jobs in Bingham Farms, MI in the last 12 months.
Job Locations and Reviews
Completed comprehensive Gold Plan furnace inspection on less than one-year-old unit located in basement. Performed full system evaluation including visual inspection of furnace cabinet, ductwork connections, and venting system, verified proper operation of all safety controls and components, checked airflow and combustion efficiency, and confirmed all equipment is functioning within manufacturer specifications. Customer renewed Gold Plan membership on site during visit.
Completed furnace inspection and replacement estimate for 13-year-old heating system located in basement. Evaluated existing equipment condition, ductwork configuration, and thermostat controls to provide comprehensive replacement recommendations for aging HVAC system.
Completed comprehensive Gold Furnace Inspection on 13-year-old furnace unit located in basement. Performed electrical diagnostics using clamp multimeter to verify system performance and electrical draw. Inspection revealed rust and corrosion buildup along interior cabinet seams and access panel edges, indicating moisture exposure over time. All electrical connections, wiring harnesses, and control circuits were examined and found to be operational. Documentation photos captured for maintenance records.
Completed installation of stainless steel double-basin kitchen sink with modern pull-down faucet in brushed nickel finish and coordinating soap dispenser. Connected all drain assemblies including garbage disposal unit with proper PVC trap configuration, verified all supply line connections, and tested system for proper drainage and leak-free operation.
Completed full HVAC system installation including 90,000 BTU furnace and 4-ton air conditioning unit. Installed chimney liner for proper venting, whole-home humidifier, and thermostat. Performed system flush, installed condensate pump, and evacuated refrigerant lines to proper vacuum levels as verified by micron gauge readings. Added electrical breakers to service panel for new equipment, reconnected all utilities, and tested system operation to manufacturer specifications.
Responded to service call for basement air conditioning unit failing to maintain adequate cooling during hot weather. Upon arrival, verified thermostat display showing 80°F indoor temperature and confirmed system was running but not achieving setpoint. Performed diagnostic evaluation of AC system including visual inspection of indoor and outdoor components, electrical panel verification, and system performance assessment. Documented current operating conditions with photographs of thermostat readings and electrical panel configuration for service records.
Completed electrical estimate for new whole home generator installation at manufactured home. Assessed existing natural gas meter location on exterior brick wall and evaluated current electrical panel capacity and available space in utility room for generator transfer switch integration. Documented gas supply routing and electrical service configuration to determine optimal generator placement and connection requirements.
Returned to site with replacement Honeywell HZ311 zone control board and non-programmable thermostats to complete rewiring and resolve previous system issues. Successfully installed and wired new zone board to control two-zone HVAC system serving main floor (Zone 1) and master bedroom (Zone 2), verified all zone dampers operating correctly, and confirmed proper system operation with cooling restored to both zones.
# HVAC Service Completed Responded to no cooling complaint on system less than 10 years old. Upon inspection, diagnosed failed control board preventing unit operation. Removed defective control board from air handler for bench testing and confirmation. Board will be transported to shop for further diagnostics on rack Wednesday. Customer approved repair estimate and work was sold.
Responded to service call for air conditioning system not providing adequate cooling. Performed comprehensive evaluation of existing outdoor condensing unit located on right side of property, which showed significant age-related wear, discoloration, and dirt accumulation on cabinet surfaces. Documented current system condition through photographic assessment, noting weathered tan metal casing with horizontal louver ventilation grilles, aged concrete pad foundation, and associated electrical components including conduit and junction boxes mounted to brick exterior wall. Provided detailed replacement estimate options for complete system upgrade to address inadequate cooling performance and aging equipment concerns.
Responded to no cooling call on 2023 air conditioning system with condenser not running and thermostat displaying 81 degrees. Upon arrival, inspected zoned HVAC control system and found issue with HZ311 zone control panel wiring configuration. Verified proper connections at terminal blocks, checked all zone circuits, and tested system operation across all three zones. Restored cooling function and confirmed proper condenser operation with all zones calling for cooling as needed.
Responded to service call for major leak originating from recently installed garbage disposal unit. Upon inspection, identified leak at disposal discharge connection to drain assembly. Tightened discharge elbow connection and verified proper alignment of PVC drain piping. Tested system by running water and operating disposal unit to confirm leak was resolved and all connections remained secure and dry.
Responded to callback regarding extended hot water delivery time following 75-gallon power vent water heater installation. Inspected installation in basement mechanical room, verified all plumbing connections, PVC venting, and unit operation. Documented existing installation with photos showing proper mounting, code-compliant piping configuration, and manufacturer labeling intact.
Responded to no cooling emergency call with frozen evaporator coil. Upon inspection, found outdoor condenser coil severely clogged with heavy dust and debris accumulation, restricting airflow and causing system freeze-up. Cleaned condenser coil, removed thick layer of accumulated debris from filter surface, and allowed system to thaw completely before testing. Verified proper airflow restoration and normal system operation upon completion.
Completed Gold AC Inspection on residential 10+ year old air conditioning system with outdoor condenser unit and basement-located air handler. Performed comprehensive system evaluation including visual inspection of condenser unit, which showed normal weathering and minor debris accumulation on fan grille and surrounding area. Confirmed equipment operational status with homeowner and verified system functionality under current weather conditions suitable for accurate performance assessment.
Responded to slow-draining kitchen sink in 30-year-old residence. Upon inspection, found stainless steel sink basin with visible mineral deposits and water spotting, indicating drainage issues isolated to kitchen area only. Accessed under-sink plumbing system and inspected garbage disposal unit, drain lines, and PVC waste connections. Identified partial obstruction causing reduced flow rate over 2-3 day period. Cleared blockage from drain line using appropriate mechanical methods. Verified proper drainage function of disposal unit and confirmed all connections secure with no leaks present. Tested system flow rate and restored full drainage capacity to kitchen sink.
Completed installation of a 75-gallon Bradford White pressure vessel water heater in basement utility room. Connected unit to existing copper supply lines with blue-handled shut-off valves, integrated circulator pump assembly with red power switch at top of tank, and tied into overhead PVC distribution piping using appropriate fittings and transitions. Secured all piping to concrete walls with metal strapping per code requirements, verified all connections for proper operation, and ensured unit was properly labeled with installation documentation.
Performed maintenance flush on 25-year-old tanked water heater located in lower level that had not been serviced in an extended period. Addressed leaking temperature and pressure relief valve that was causing water discharge onto concrete floor. Completed full tank flush to remove sediment buildup, inspected all connections and safety components, and documented existing wall moisture concerns in utility area for homeowner awareness.
Completed air conditioning system startup for newly installed Lennox EL16KC1-042-230A02 condensing unit with R-410a refrigerant and matching indoor evaporator coil. Verified proper electrical connections at 208/230V single-phase power supply, confirmed compressor RLA of 17.3 amps and LRA of 123 amps within specifications, and tested 1/4 HP condenser fan motor operation. Inspected refrigerant line set connections between outdoor unit and basement-installed air handler, checked factory refrigerant charge, and verified system pressures. Confirmed proper condensate drainage through white PVC piping, tested all safety controls and warning labels, and validated ductwork connections to furnace plenum. System operating efficiently with all components functioning as designed.