Your home is where life happens—family dinners, cozy nights in, and weekend projects. But when something goes wrong, whether it’s a cold house in the middle of winter or an unexpected plumbing issue, it throws everything off track. That’s why FLAME Heating, Cooling, Plumbing & Electrical has been serving the Detroit Metro area for over 70 years, making home repairs and maintenance hassle-free. Our team is here to get your home back to normal quickly, with reliable, straightforward service you can trust. When you need Grosse Pointe Farms home services, call the Flame team at (586) 217-2512 or schedule your next service online.
Reliable Electrical Services in Grosse Pointe Farms

Dealing with electrical issues can be frustrating and dangerous. Whether your lights keep flickering, your breakers won’t stop tripping, or you’re thinking about upgrading your entire home’s wiring, FLAME’s licensed electricians have the expertise to make sure everything is safe, efficient, and up to code. Our industry-leading Grosse Pointe Farms electrical services include:
- Rewiring & Electrical Panel Upgrades – Old wiring can pose a fire hazard. We bring homes up to modern safety standards with full rewiring and panel upgrades.
- Circuit Breaker Troubleshooting & Repairs – If your breakers trip often, there could be an underlying issue. We diagnose and fix electrical overloads.
- Lighting for Every Room – Whether you need security lighting outdoors or modern recessed lighting inside, we install and upgrade all types of lighting.
- EV Charger Installation for Your Home – Thinking about going electric? We install home EV chargers so you can charge your vehicle easily and safely.
- Backup Generators to Keep You Running – Power outages are unpredictable, but you don’t have to be caught off guard. We install and maintain whole-home generators.
- Electrical Inspections for Peace of Mind – If you’re concerned about an electrical issue, we conduct full inspections and provide expert recommendations.
Grosse Pointe Farms Plumbing Services for a Functional Home
From a leaky faucet that won’t stop dripping to a water heater that won’t heat, plumbing problems can be frustrating—and expensive if left unchecked. FLAME’s expert plumbers are ready to help, whether it’s a minor fix or a major installation, with plumbing services in Grosse Pointe Farms you can trust.
Hot Water Solutions
No one enjoys an unexpected cold shower. Whether your water heater needs a quick repair or you’re ready to upgrade to a more efficient tankless system in Grosse Pointe Farms, we ensure you have reliable hot water when you need it.
Drain Cleaning & Clog Removal
A slow drain might seem like a small issue, but it can quickly turn into a major blockage. Our professional tools and techniques clear out stubborn clogs, restoring proper water flow before bigger problems arise.
Sewer Line Inspections & Repairs
If you notice unusual odors or slow-draining sinks, your sewer line might be the culprit. We perform thorough inspections to pinpoint issues and provide fast, effective repairs to prevent costly damage.
Leak Detection & Repair
Even small leaks can lead to big problems, from water damage to mold growth. We use advanced detection methods to find and fix leaks before they escalate.
Gas Line Installation & Repair
Need a gas line installed for a new appliance, or concerned about an existing one? Our team ensures safe, code-compliant installations and repairs.
Sump Pump Services in Grosse Pointe Farms
A working sump pump is your home’s first line of defense against basement flooding. We install, repair, and maintain sump pumps to keep your home protected, rain or shine.
Kitchen & Bathroom Plumbing Upgrades
Looking to upgrade your kitchen or bathroom? Whether it’s a new sink, faucet, or garbage disposal, we handle installations and repairs with precision and care.
Grosse Pointe Farms HVAC Services for Year-Round Comfort

There’s nothing worse than waking up to a freezing house in the middle of the night or coming home to an AC that’s barely working on a sweltering day. We know how frustrating that can be, which is why our team is ready to respond quickly, diagnose the issue, and get your system running again with reliable heating and cooling services in Grosse Pointe Farms.
Heating Services
- New Furnace Installations in Grosse Pointe Farms – If your furnace is outdated or inefficient, we install high-efficiency models that keep your home warm while saving on energy costs.
- Fast & Reliable Furnace Repairs – A furnace that won’t start or isn’t heating properly needs professional attention. We diagnose and repair all types of furnace problems.
- Boiler Repairs & Installations – If your home uses a boiler for heat, we keep it running efficiently with expert maintenance and repairs.
- Heat Pumps for Efficient Comfort – Heat pumps provide both heating and cooling in one system. We install and maintain them for reliable year-round efficiency.
- Annual Tune-Ups to Prevent Problems – Regular maintenance extends the life of your heating system and helps prevent costly breakdowns.
Cooling Services
- AC Installation & System Upgrades – A properly sized and installed air conditioning system keeps your home cool and your energy bills low.
- Quick Air Conditioner Repairs – If your AC isn’t cooling properly or is making strange noises, our technicians troubleshoot and fix the issue fast.
- Ductless Mini-Split Systems for Custom Cooling – Great for home additions or rooms without ductwork, mini-splits provide efficient, targeted cooling.
- Routine AC Maintenance – Regular tune-ups keep your system running at peak performance and prevent mid-summer breakdowns.
- Air Quality Solutions for a Healthier Home – From air purifiers to humidity control, we help you create a cleaner, healthier indoor environment.
Book Your Appointment with FLAME Today
Your home should be a place where you feel comfortable and secure, not stressed about unexpected breakdowns. Whether it’s a quick fix, routine maintenance, or a major system upgrade, FLAME Heating, Cooling, Plumbing & Electrical has you covered. Give (586) 217-2512 a call today or book your service visit online and let’s get your home back to running smoothly.
Recent Jobs and Reviews in Grosse Pointe Farms , MI
Grosse Pointe Farms, MI at a glance
Flame Heating, Cooling, Plumbing, Electrical has completed 20 jobs in Grosse Pointe Farms, MI in September 2026.
The most recent job was on September 30, 2026.
Flame Heating, Cooling, Plumbing, Electrical has completed 455 jobs in Grosse Pointe Farms, MI in the last 12 months.
Job Locations and Reviews
Responded to kitchen sink backup issue at residential property. Upon arrival, accessed plumbing system through basement area and identified drainage obstruction in kitchen sink line. Successfully cleared blockage using appropriate drain cleaning equipment, restoring proper water flow and drainage function. Tested system to verify complete resolution of backup condition.
Completed comprehensive Gold Furnace Inspection on two basement-located furnace units, both approximately one year old and operational at time of service. Performed thorough examination of internal mechanical and electrical components including gas valve assemblies, blower motors, ignition systems, control boards, and wiring harnesses. Inspected burner assembly, heat exchanger accessibility, and all safety controls. Verified proper gas connections, electrical connections, and component mounting. Documented equipment condition through photographic inspection showing normal operational wear consistent with age of units.
Completed comprehensive boiler maintenance on a 2-year-old hot water boiler system located in basement. Performed full inspection of boiler components, including internal heat exchanger coils, refrigerant lines, and associated piping infrastructure. Evaluated thermostat operation, humidifier functionality, and hot water tank condition as part of standard tune-up protocol. All system components found operating within normal parameters with proper condensation present on coils indicating effective heat transfer. Documentation photos captured of internal coil assembly and overhead mechanical room piping configuration for service records.
Completed installation of replacement tanked water heater in basement utility area with extended venting system. Due to the exceptionally long venting run required for this installation, additional venting materials were utilized to properly exhaust combustion gases from the unit. The installation included connecting flexible metallic ductwork with rigid metal elbows to accommodate the extended horizontal run across the ceiling space, ensuring proper draft and code compliance. All water supply connections were completed using existing copper piping infrastructure, and the unit was reconnected to the distribution system. The water heater was positioned and secured in accordance with manufacturer specifications and local plumbing codes. Final installation includes fully operational venting system with appropriate pitch and support, restored water service, and verified proper operation of all mechanical components.
Completed general preventative maintenance inspection on 8-year-old forced air furnace located in basement. Unit was operational upon arrival. Performed comprehensive system diagnostics using calibrated digital meter to measure temperature differential, static pressure, and combustion efficiency parameters. All readings fell within manufacturer specifications. Conducted visual inspection of heat exchanger, burner assembly, and venting system with no deficiencies noted. System operating properly with no repairs required at this time.
Completed comprehensive annual Gold maintenance inspection on 18-year-old boiler system. Performed full tune-up service including visual inspection of heat exchanger tubes, burner assembly, and internal components; all found in serviceable condition with normal wear patterns for unit age. Verified proper operation of all safety controls, cleaned burner assembly, tested combustion efficiency, and confirmed system is functioning within manufacturer specifications with no issues identified.
Completed annual heating maintenance and tune-up on a 13-year-old furnace located in the basement. Performed comprehensive inspection of all system components including heat exchanger, burner assembly, and blower motor. Checked and cleaned flame sensor, inspected gas connections for leaks, and verified proper combustion and venting. Tested thermostat operation and confirmed accurate temperature readings on Niagara ECOHD programmable unit. Measured and recorded temperature rise across heat exchanger within manufacturer specifications. Inspected and cleaned burners, checked ignition system functionality, and verified proper flame characteristics. Examined all electrical connections, tested safety controls including limit switches and rollout sensors. Checked blower motor operation, lubricated where applicable, and inspected belt condition and tension. Verified proper airflow through supply and return ductwork. Changed air filter and confirmed proper system cycling. Tested furnace through
Completed comprehensive Gold furnace inspection and tune-up on 18-year-old Bryant model 310AAV048110 unit located in basement. Performed full system diagnostics including temperature differential measurements across ductwork, thorough inspection of blower assembly and motor operation, examination of gas valve and burner components, verification of all electrical connections and control wiring integrity, and assessment of heat exchanger condition. All components found operating within manufacturer specifications with normal dust accumulation for unit age. System tested and confirmed proper operation upon completion.
Performed preparatory plumbing work under kitchen sink in advance of dishwasher installation. Cleaned and serviced existing PVC drain assembly, including P-trap and associated fittings. Disconnected and removed old dishwasher unit, including water supply line and drain connections. Inspected copper supply lines and shutoff valves to ensure proper function for new appliance installation. Cleared cabinet space and verified all plumbing connections were secure and operational.
Completed comprehensive tune-up maintenance on two 8-year-old furnaces located in basement. Performed full system inspection including burner assembly, ignition components, gas valve operation, blower motor function, and electrical connections. Verified proper operation of flame sensors, pressure switches, and all safety controls. Inspected condensate drainage system and PVC venting for proper configuration. All components found to be in good working condition with no signs of corrosion or deterioration. Both units operating within manufacturer specifications and ready for heating season.
Completed Gold Furnace Inspection on Bryant forced-air heating system located in basement. Unit is under 10 years old and confirmed operational at time of service. Performed comprehensive inspection of furnace components, verified proper operation of all mechanical systems, examined ductwork and venting connections including PVC condensate drainage system, and documented equipment condition with photographs. All systems functioning as designed with no immediate service needs identified.
Completed comprehensive Gold furnace inspection on 4-year-old forced air gas furnace located in basement. Verified unit operational status with burner assembly firing properly, displaying even blue flame distribution across heat exchanger. Inspected internal components including blower motor, electrical connections, control board wiring, and PVC condensate drain/vent piping. All systems functioning within normal parameters with no deficiencies noted.
Completed comprehensive fall tune-up on 9-month-old York furnace system in basement. Performed full inspection of burner assembly, confirmed proper blue flame combustion pattern and efficient operation of gas valve controls. Corrected equipment records to reflect accurate installation date, verified all manufacturer specifications, inspected water heater safety labels and compliance markings, and provided additional air filter per customer request.
Responded to no heat complaint on 15-year-old Lennox 2-stage furnace located in basement. Upon inspection, confirmed unit was not producing heat and assessed overall system condition including existing Bryant PLUS 95s Evolution equipment visible in mechanical room. Evaluated furnace age, performance history, and current operational status. Provided comprehensive replacement estimate options for new high-efficiency furnace system to restore heating capability to the residence.
Completed comprehensive Gold furnace inspection on two HVAC units located in basement mechanical room. Both units are approximately 3 years old and operating properly at time of service. Performed full system evaluation including visual inspection of boiler/heating unit with expansion tank, examined all piping connections and insulation integrity, verified proper operation of control panels and safety systems, and inspected water heater and associated plumbing components. All equipment found to be in good working condition with no immediate service needs identified. Documentation photos captured for maintenance records.
Completed comprehensive fall heating tune-up on basement furnace for Flame Fixed plan member. Performed full system inspection including blower motor assembly, gas valve operation, heat exchanger integrity, electrical connections, and ignition components. All internal mechanical and electrical systems inspected, tested, and found operating within manufacturer specifications; unit ready for heating season.
Completed comprehensive Gold Furnace Inspection on multi-unit residential HVAC system consisting of two main furnaces, one boiler, and one garage heater. Performed detailed inspection of basement and garage-located equipment, all units approximately 10+ years old and currently operational. Conducted flue gas analysis using combustion analyzer on natural gas system, recording combustion efficiency readings, CO levels, and stack temperature measurements. Inspected electrostatic air cleaner unit manufactured in December 2020, verified proper operation and electrical specifications. Noted filters are on order through parts vendor with warehouse delivery scheduled. All safety labels and warnings verified intact on equipment panels. System operating within normal parameters at time of inspection.
Completed Gold plan annual furnace inspection on 8-year-old Bryant furnace located in basement. Performed comprehensive tune-up including system diagnostics, burner assembly cleaning, heat exchanger inspection, blower motor lubrication, air filter evaluation, thermostat calibration, and safety control testing. Equipment information was updated in records to reflect accurate make, model, and age as confirmed on-site, correcting previous documentation that listed unit as 12-year-old Trane model.
Responded to service call for moisture detected beneath newly installed boiler in basement. Upon inspection, identified minor leak at brass valve fitting on supply line connection. Tightened valve connection and verified all plumbing joints for proper seal. Monitored system during operation cycle with no further moisture detected. Unit returned to normal operation with all connections secure.
Completed full HVAC system installation including 90,000 BTU furnace and 3-ton air conditioning unit in utility closet. Installed new thermostat, Aprilaire humidifier, condensate pump with PVC drain lines, and all necessary electrical connections and refrigerant lines. Secured mechanical and electrical permits, positioned AC condenser in rear yard, and coordinated utility rebate eligibility. All equipment tested and operational upon completion.